How to Set a Target for a Task

A task is a work that is assigned to a shift or a process that can have a target that is defined by two values: Target and Unit. Target is the meaning of the task that is measured by a numerical value; Unit is a predefined measurement. Thus, a target of the task, e.g. "15 tonnes" means that "15" is the Target and "tonnes" is the Unit. Although a task can be a Schedule Task, a Standard Task or a Planned Task, the target setting always requires editing. This guide explains how to accomplish this.

Info!

For more information about tasks see the "What is the difference between schedule task, standard task and planned task?" FAQ article.

Step-By-Step Guide

This guide provides instructions on how to:

Follow these steps to set a target of a task in Fewzion.

1. Click on the Planning Board icon

 

 

Set a Target for a Schedule Task

1. Right click on any task of the particular shift and click Edit Shift Plan

 

2. Double click on the Schedule Task on the Shift Plan. This opens the Edit Shift Plan Task form

 

3. Enter the required Target and Unit. Click OK

 

 

Set a Target for a Standard Task

1. Double click on the Standard Task on the Planning Board. This opens the Edit Standard Task form

 

2. Enter the required Target and Unit. Click OK

 

 

Set a Target for a Planned Task

1. Double click on the Planned Task on the Planning Board. This opens the Edit Planned Task form

 

2. Enter the required Target and Unit. Click OK

 

Have more questions? Submit a request

Comments

Powered by Zendesk